New Construction

New Construction pin piles in a limited space home site.

Solution? 5 feet is all we need to access the site. Heavy wall galvanized pipe piles driven to refusal per the plans. Piles are cut to length. a top plate is attached and the pile is filled with concrete. A hook bar is placed in the top of the plle.